Ford Long Beach Assembly Plant Pictures Office and Pressed Steel Buildings 1930s
Ford Long Beach Assembly Plant Apr 21, 1930, EXTERIOR-OFFICE BUILDING, WEST (FRONT) AND NORTH SIDES, OPENING DAY
Apr 21, 1930, EXTERIOR-OFFICE BUILDING, WEST (FRONT) AND NORTH SIDES, OPENING DAY

Ford Long Beach Assembly Plant Apr 24, 1931, EXTERIOR-PRESSED STEEL BUILDING, NORTH AND EAST SIDES, WAREHOUSE IN BACKGROUND, RAILROAD SPUR IN FOREGROUND, BONDERITE TANK AT LEFT
Apr 24, 1931, EXTERIOR-PRESSED STEEL BUILDING, NORTH AND EAST SIDES, WAREHOUSE IN BACKGROUND, RAILROAD SPUR IN FOREGROUND, BONDERITE TANK AT LEFT

Ford Long Beach Assembly Plant Dec 27, 1931, EXTERIOR-PRESSED STEEL BUILDING, EAST SIDE, SHOWING EXTERIOR OF THE BONDERITE TANK
Dec 27, 1931, EXTERIOR-PRESSED STEEL BUILDING, EAST SIDE, SHOWING EXTERIOR OF THE BONDERITE TANK

Ford Long Beach Assembly Plant Mar 18, 1933, INTERIOR-OFFICE BUILDING, LOBBY AND STAIRWELL, SHOWING DAMAGE AFTER AN EARTHQUAKE
Mar 18, 1933, INTERIOR-OFFICE BUILDING, LOBBY AND STAIRWELL, SHOWING DAMAGE AFTER AN EARTHQUAKE

Ford Long Beach Assembly Plant Mar 18, 1933, INTERIOR-PRESSED STEEL AND WAREHOUSE BUILDINGS, 1ST FLOOR, SHOWING DAMAGE TO FREIGHT ELEVATOR SHAFT FROM EARTHQUAKE
Mar 18, 1933, INTERIOR-PRESSED STEEL AND WAREHOUSE BUILDINGS, 1ST FLOOR, SHOWING DAMAGE TO FREIGHT ELEVATOR SHAFT FROM EARTHQUAKE

Next Picture
Pictures Index
Long Beach Assembly Plant Index